# Your home. Energy, considered .

HOME ENERGY STORAGE / MALAYSIA

# Your home.
Energy, considered .

Plan battery storage around the essentials you use at home. Choose an all-in-one system or a battery for a compatible existing inverter.

[Explore the collection](https://my.elvorka.com/en/#products)[Find your fit](https://my.elvorka.com/en/#planner)

One home. A considered system.
Integrated storage or a battery for your inverter.

![EU 230 V — INSTALLATION ILLUSTRATION](https://my.elvorka.com/assets/optimized/ae00f4d606238356-1536-q92.webp)

INSTALLATION ILLUSTRATION  01 / 03

INSTALLATION ILLUSTRATION

[INVERTER INCLUDED  EU 230 V  Integrated battery + inverter](https://my.elvorka.com/en/#products)

SMALLER FOOTPRINT.
GREATER POSSIBILITIES.

07  Product families

29  Listed configurations

5.12–48  kWh  Nominal energy across the collection

[Product tour](https://my.elvorka.com/en/#product-tour)

Product tour

## One home. A considered system.

Integrated storage or a battery for your inverter.

RESIDENTIAL ENERGY STORAGE / MALAYSIA  LFP

![Installation illustration of a TR Pro battery in a residential equipment area.](https://my.elvorka.com/assets/optimized/53da77de460e43e8-1536-q92.webp)

HOME BATTERY INSTALLATION  Product scene illustration

[TR PRO / WALL STORAGE

![elvorka TR Pro wall-mounted LFP battery](https://my.elvorka.com/assets/optimized/46a9d9acb1b4d427-1560-q92.webp)

Storage. In its element.  10.24 / 16.076 kWh nominal energy  51.2 V  NOMINAL DC  IP66  ENCLOSURE](https://my.elvorka.com/en/#products)

[All products](https://my.elvorka.com/en/#products)

01  TWO WAYS TO STORE

## Start with your setup.

A new installation or an existing inverter.
Choose your starting point.

[INTEGRATED SYSTEMS

### A fresh start.
All in one.

Battery and inverter in one system.
A coordinated starting point for a new installation.

EXPLORE ALL-IN-ONE  6 listed configurations](https://my.elvorka.com/en/#products) [BATTERY SYSTEMS

### Your inverter.
More possibility.

Wall, stack or rack-mounted LFP storage.
Match the voltage and confirm compatibility.

EXPLORE BATTERIES  23 listed configurations](https://my.elvorka.com/en/#products)

TR PRO / MATERIAL & FORM

01 — ENCLOSURE / FRONT ELEVATION  PRODUCT DETAIL

03  LOOK A LITTLE CLOSER

## Details you can
build around.

Start with the chemistry. Check the voltage. Specify the enclosure. Every good installation begins with a clear understanding of the product.

LiFePO₄  LFP battery chemistry

51.2  V  TR Pro nominal DC voltage

IP66  TR Pro enclosure rating

CAN / RS485  Communication interfaces

[See TR Pro specifications](https://my.elvorka.com/en/#products)

## Battery storage for tropical homes.

Keep evening essentials and home-office equipment in your backup plan. From an enclosed terrace-house utility room to a protected coastal service space, choose the storage format around your home, its heat and moisture exposure, and the inverter you use.

01

### Dry terrace-house utility room

For a new system in a dry enclosed room beside the car porch, one cabinet brings the battery and inverter together and keeps the equipment layout straightforward.

EU 230 V offers integrated battery storage with 6.2 or 12 kW rated AC configurations and an IP21 housing. Allow the model-specific cooling and service space, and select the configuration around your essential circuits.

What is the hottest expected temperature inside this room?

- Are the vents and service sides clear of parked vehicles, cupboards and stored items?

02

### Protected storage for a coastal home

A sheltered equipment space gives coastal homes a place to organise storage and its connections. METMalaysia identifies stronger northeast-monsoon rain exposure in eastern Peninsular Malaysia, western Sarawak and northeastern Sabah.

Compare the compact TR Pro battery and the expandable HP Ultra stack, both listed with IP66 enclosures. Use the room and enclosure together in the design; rain, condensation and coastal exposure still need model-specific review.

Can wind-driven rain, wash water or standing water reach this location?

- Is the site exposed to coastal air or condensation, and what protection does the exact model require?

03

### Existing inverter in a compact service area

Add energy capacity while retaining an existing inverter where compatibility is established. Wall-mounted and modular formats give different ways to use a dedicated service area.

TR Pro is a 51.2 V battery family; HP Ultra is high voltage. Match the inverter's battery-voltage window, CAN/RS485 support and charge/discharge settings. Do not substitute a high-voltage stack for a low-voltage battery connection.

What are the inverter make, model and supported battery-voltage range?

- Is there room for the battery, mechanical fixing and separate protected power/communication routes?

Specifications

- TR Pro lists charging at 0 to 55 °C and discharging at −20 to 60 °C. EU 230 V lists charging at 0 to 55 °C and discharging at −20 to 55 °C. Check room temperature and any model-specific derating; do not assume constant output across the entire range.

- IP66 on TR Pro/HP Ultra is not a blanket approval for any outdoor position. TR standard and HP K list IP20 with IP54 optional, TB rack lists IP20, and EU lists IP21. Verify the exact housing option and installation manual.

- Use kWh to plan duration and kW to check the load. If air-conditioning or a pump is required, provide its actual running and starting requirements rather than adding it to a basic preset without review.

02  THE COLLECTION

## Storage. Clearly specified.

Seven families. Three installation formats.
Compare the details that matter.

3 product families

### TR Pro.

Wall-mounted. Thoughtfully contained.

10.24 / 16.076  kWh

LFP battery storage in a wall-mounted format, with three specified models and an IP66 enclosure. Pair with a compatible external inverter.

[Explore all product details ↗](https://my.elvorka.com/en/products/tr-pro/)

### EU 230 V.

An integrated starting point.

10.24 / 16.076  kWh

An integrated inverter and 51.2 V LFP battery system. Three listed power-and-capacity configurations, with rated AC output of 6.2 or 12 kW.

[Explore all product details ↗](https://my.elvorka.com/en/products/eu-230v/)

### HP Ultra.

Storage with room to grow.

8–48  kWh

A modular aluminium-alloy LFP battery stack. Six specified configurations from 8 to 48 kWh, for integration with a compatible external inverter.

[Explore all product details ↗](https://my.elvorka.com/en/products/hp-ultra/)

This collection presents 7 product families and 29 listed configurations. Model availability, electrical configuration, local installation requirements and after-sales arrangements must be confirmed for your project; this page does not claim local stock or a local service network.

Your setup matters. Battery-only products require a compatible external inverter.

[Download the full collection](https://my.elvorka.com/downloads/ELVORKA_my_en_Product_Guide.pdf)

PRODUCT DETAIL / ORIGINAL LITERATURE

## Every side.
Every connection.

Look beyond the headline specifications. Explore original product views, labelled interfaces and details for each family.

05  KNOW YOUR ESSENTIALS

## Explore
your backup.

Start with the essentials you want to keep running. Adjust the load and battery size to explore an indicative backup duration.

Battery energy is measured in  kWh .
Appliance power is measured in  kW .
Your inverter must support the load.

Inverter included in all-in-one systems; external for battery-only products.

BACKUP EXPLORER  YOUR ESTIMATE  Watt / kW

Battery capacity  10.24  kWh

Average essential load  1.0  kW

0.2 kW  5.0 kW

Planning examples only: these are assumed average appliance watts, not measurements or a household survey. Compressor and motor starting peaks need a separate check. Air-conditioning, electric water heating and cooking are not included.

INDICATIVE BACKUP

8.3  hours

How this estimate works

Nominal battery capacity × 90% assumed usable depth × 90% assumed inverter efficiency ÷ average load. These are planning assumptions, not guaranteed product ratings. Actual backup varies with usable energy, temperature, battery age, standby use and load changes. Starting currents and inverter limits must be checked separately.

[Use this in my project](https://my.elvorka.com/en/#enquiry)

OUR PRODUCTS / AT HOME

### Storage for your home in Malaysia.

Start with your appliances, available installation space and existing equipment. Compare battery energy in kWh, confirm inverter power in kW and build a clear project brief in English or Bahasa Melayu.

EU 230 V / INVERTER INCLUDED

#### Keep everyday essentials in the plan.

List selected lighting, fans, refrigeration and internet equipment, then estimate their average load and required backup duration.

HP ULTRA / BATTERY ONLY

#### A clearer starting point for a new system.

An all-in-one combines the battery and inverter in one system. Confirm the selected AC configuration and the circuits you want it to support.

TR PRO / BATTERY ONLY

#### Add storage to a compatible inverter.

For battery-only storage, check DC voltage, communication protocol and supported charge and discharge settings before selecting a wall-mounted or modular battery.

Installation illustrations featuring products from this collection. Scenes are composites, not photographs of completed customer projects. Visible layouts are illustrative; final connections, protection and clearances follow the selected model’s installation manual and site design.

06  KNOW YOUR SYSTEM

## Choose with clarity.

[elvorka product collection  English · PDF · 8 pages  PDF](https://my.elvorka.com/downloads/ELVORKA_my_en_Product_Guide.pdf)

[elvorka views & interfaces  35 source views · 7 families · English PDF  PDF](https://my.elvorka.com/downloads/product-views-and-interfaces.pdf)[Explore the detail library  Original product views, labelled interfaces and source references.](https://my.elvorka.com/en/#technical-library)

[Original product collection · English PDF ↘](https://my.elvorka.com/downloads/energy-product-collection.pdf)

Good questions.
Straight answers. Start with the system you have.
Choose the storage you need.

How should I plan a home battery project in Malaysia?

Record your project city, essential appliances, expected backup duration and any existing inverter model. Check the selected product's voltage, enclosure rating, temperature limits and installation requirements with your installer. Request written confirmation of compatibility, supply, warranty and installation scope for the exact configuration.

Can I connect a 51.2 V battery to my existing inverter?

A nominal voltage match alone does not confirm compatibility. Your installer should verify the inverter’s DC voltage window, charge and discharge current, CAN or RS485 protocol, firmware and protection settings. High-voltage batteries must not be connected to a low-voltage inverter.

What should be checked for a project in Malaysia?

Confirm the installation’s AC supply, inverter phase requirements, essential-load circuits and local electrical requirements. The EU integrated range lists 230 V AC and 50 / 60 Hz. TA6000 lists 120 V US and 230 V EU options; specify the required market configuration. The project’s backup circuits and protection requirements need installer review.

Can these batteries be installed outdoors?

TR Pro and HP Ultra list IP66 enclosures. Other families have different or optional protection ratings. An IP rating alone is not an installation instruction: check the selected model’s temperature limits, clearances, shelter, ventilation and installer requirements.

Does more battery capacity mean more output power?

No. Capacity in kWh describes stored energy. Power in kW describes the rate energy can be delivered. Battery-side DC ratings and inverter AC output are different. Both the selected battery configuration and inverter must support your operating and starting loads.

How do I confirm price, warranty and availability?

Prepare a project brief with your city, required loads, existing inverter and selected product. Ask your supplier to confirm the exact configuration, quotation currency, warranty terms, installation scope, delivery timing and after-sales arrangements in writing.

Does IP66 make any outdoor position suitable?

No. IP66 does not by itself establish protection against flooding, condensation or coastal corrosion. Confirm the exact battery version, shelter, mounting, drainage and service clearances with the installer.

Can the basic examples include air-conditioning?

The examples exclude air-conditioning. Provide the appliance's operating load, start-up demand and expected operating time, then confirm both battery energy and inverter output for the proposed system.

Can I add a battery to any existing inverter?

No. Confirm the inverter model, supported battery-voltage range, current limits, communication protocol and settings. A 51.2 V battery and a high-voltage modular stack are different system choices.

Your next chapter

## Start with your setup.

[01

### Explore the collection

Seven families. Three installation formats.](https://my.elvorka.com/en/#products)[02

### Find your fit

Start with the essentials you want to keep running.](https://my.elvorka.com/en/#planner)[03

### Prepare my enquiry

Tell the story of your home.](https://my.elvorka.com/en/#enquiry)

YOUR NEXT CHAPTER

## Let’s plan
your system .

Tell the story of your home. Prepare a clear project brief to share with your installer or storage supplier.

YOUR HOME. YOUR ENERGY.

**Contact the Founder**

[eric@elvorka.com](mailto:eric@elvorka.com)

Share your city, selected circuits, battery model and installation environment. Availability, electrical configuration and project requirements are confirmed by enquiry.

Your name  (optional)

Project city  *

Your email

Phone / WhatsApp (optional, include country code)

Company (optional)

I am planning for

Existing inverter

Product interest

What matters to you?

Installation environment

Lowest and highest expected room temperature

Your submitted details are saved for the ELVORKA team to review and follow up. Please avoid including passwords, identity documents or unrelated sensitive information.

I agree that ELVORKA may use these details to respond to this project enquiry.

ELVORKA

## A clearer view of home storage.

Practical reading for choosing battery capacity, checking equipment-room conditions and preparing a useful installation brief.

---

https://my.elvorka.com/en/

ELVORKA · eric@elvorka.com
